We track our production using a Drawing Control Log. The log lists the drawing number, drawing description, the system file name, list of external references, layer scripts, scale, original estimate of time to complete the drawing and, as production proceeds, the estimated time left to finish each drawing.
The log can be forwarded on a weekly or monthly basis, depending on the needs of the client. It is an invaluable document not only to track the progress of work, but also when returning to archived drawings years after completion.
|